
Tile adhesives and mortars engineered for precision installation.
Jiuling manufactures cement-based tile adhesives and dry-mixed mortars across three workshops and four automated, Siemens-controlled production lines — built for contractors and distributors who need consistent, documented performance.
- Workshops
- 3
- Automated lines
- 4
- Daily output
- ~260 t
- Lead time
- ~15 days
Production capacity built for consistent supply
Up to 300,000 tons of annual capacity, with standard orders completed in about 15 days.
2012
Established
03
Workshops
04
Automated production lines
0 t260 t
Daily output
Two families, one production standard
Formulations trusted across installation types
Formulated for the job in front of you
A factory built for repeatable results
Every batch runs through the same Siemens-controlled process, from raw material intake to final packaging — giving contractors and distributors a product that performs the same way, shipment after shipment.
- Siemens-controlled lines
- Four automated production lines run on Siemens control systems for consistent formulation batches.
- Documented quality
- Technical data sheets and test reports are available for every product in the catalog.
- Scaled capacity
- Three workshops support up to 300,000 tons of annual capacity across both product families.
- Predictable lead time
- Standard orders are coordinated for completion within about 15 days of technical confirmation.

Manufacturing flow
Visibility from batching to dispatch
Process visibility
Siemens controls track batching parameters across every automated production line in real time.
In-process checks
Formulation consistency is monitored throughout mixing, before material moves to packaging.
Technical data sheets
Published performance parameters accompany each product for specification and site reference.
Test reports
Test reports and third-party inspection support are available on request for qualified inquiries.
From inquiry to delivery
- 01
Share requirements
Submit an inquiry with your product, quantity, and application details.
- 02
Technical confirmation
Our team confirms specification, packaging, and data sheet details with you.
- 03
Production scheduling
Standard orders are scheduled for completion within about 15 days.
- 04
Delivery coordination
We coordinate packaging and dispatch logistics ahead of your target delivery date.








