Jiuling / YXIN logoJiulingTile Adhesive
Jiuling automated production facility in Zhenjiang, Jiangsu
Established 2012· Zhenjiang, Jiangsu

Tile adhesives and mortars engineered for precision installation.

Jiuling manufactures cement-based tile adhesives and dry-mixed mortars across three workshops and four automated, Siemens-controlled production lines — built for contractors and distributors who need consistent, documented performance.

Workshops
3
Automated lines
4
Daily output
~260 t
Lead time
~15 days
Verified manufacturing scale

Production capacity built for consistent supply

Up to 300,000 tons of annual capacity, with standard orders completed in about 15 days.

2012

Established

0

Workshops

0

Automated production lines

0 t

Daily output

Why Jiuling

A factory built for repeatable results

Every batch runs through the same Siemens-controlled process, from raw material intake to final packaging — giving contractors and distributors a product that performs the same way, shipment after shipment.

Siemens-controlled lines
Four automated production lines run on Siemens control systems for consistent formulation batches.
Documented quality
Technical data sheets and test reports are available for every product in the catalog.
Scaled capacity
Three workshops support up to 300,000 tons of annual capacity across both product families.
Predictable lead time
Standard orders are coordinated for completion within about 15 days of technical confirmation.
Jiuling production line and silos in Zhenjiang

Manufacturing flow

Quality process

Visibility from batching to dispatch

Quality control details

Process visibility

Siemens controls track batching parameters across every automated production line in real time.

In-process checks

Formulation consistency is monitored throughout mixing, before material moves to packaging.

Technical data sheets

Published performance parameters accompany each product for specification and site reference.

Test reports

Test reports and third-party inspection support are available on request for qualified inquiries.

Cooperation flow

From inquiry to delivery

  1. 01

    Share requirements

    Submit an inquiry with your product, quantity, and application details.

  2. 02

    Technical confirmation

    Our team confirms specification, packaging, and data sheet details with you.

  3. 03

    Production scheduling

    Standard orders are scheduled for completion within about 15 days.

  4. 04

    Delivery coordination

    We coordinate packaging and dispatch logistics ahead of your target delivery date.